Сonstruction progress
Status:
Insulation of walls under "wet" plaster (parking, cold transitions) is carried out - readiness of 93%. Waterproofing of terraces on the 6th, 10th and 11th floors has been completed. The layout of water supply and heating networks on the floors continues - 99% readiness. 97% of internal power supply networks were installed. Roofing works are underway (87%). Continue to pour the screed on the floor (98%). The hall is being decorated (97%) and plastering works in public places (98%). Installation of translucent enclosing structures on the 1st floor has been completed. Works on connection of external networks of water supply and the sewerage (30%) are carried out: installation of wells of the storm and household sewerage is completed, preparatory works on connection to the sewerage network on street are carried out. Vladimirskaya. Installation of smoke valves on the floors - 95% readiness. The elevator for transportation of fire departments (LTPP) is being installed - 95% readiness. Finishing works are being carried out in public places: tiles are laid on 10-15 floors. Hatches have been installed in the niches of utilities on 10-15 floors.
Planned completion date of construction:
IV quarter of 2020
Construction:
97%
Facade:
99%
Networks:
63%
Amenties:
24%